Caterpillar excavator
The 320DGC excavator has the best production performance in the soil conditions and is dedicated to earthwork; for customers who have no ability to buy 320D before, 320D GC is a good choice. There are two models of all imports and domestic assembly and production for customers to choose from.

 


The 320DGC excavator has the best production performance in the soil conditions and is dedicated to earthwork; for customers who have no ability to buy 320D before, 320D GC is a good choice. There are two models of all imports and domestic assembly and production for customers to choose from.


Caterpillar, as a top 500 company in the world, Caterpillar is a global leading enterprise in the field of construction machinery, mining equipment, diesel and natural gas engines, industrial gas turbines, and fireworthy hybrid power units. At the same time, Caterpillar is also a leading financial, re -manufacturing, logistics and railway service providers.


Technical parameter
Specification
The work weight of the whole machine (KG): 20400
Fighting capacity (square): 0.9
The length (mm): 5700
Tap bar (mm): 2900

performance
Rotate speed (RPM): 11.5
Walking speed (km/h): 3.5/5.7
Climbing ability (%): 70/35 °
Grounding compression (kPa): 6
Fighting excavation (KN): 140.1
Tap rod mining power (kn): 106.4
engine
Engine model: C6.4Acert
Rated power (KW/RPM): 92.3/2000
Displacement (L): 6.37
Number of cylinder: 6
Line diameter × itinerary (mm × mm): 102 × 130
Cooling method: water cooling
Hydraulic system
Maximum traffic (L/min): 205
Working Hydraulic Oil Road (MPA): 35
Walking liquid pressure circuit (MPA): 35
Rotating liquid pressure circuit (MPA): 25
Pioneer oil road (MPA): 3.9
Moving arm tank-number × cylinder diameter × itinerary (mm): 120 × 1260
Tuck Polar Tank-Number × Cyrralal diameter × Itinerary (MM): 140 × 1504
Fighting Cyc-Number × Cyrrals × Itinerary (MM): 120 × 1104
Whether the hydraulic crushing pipe road is standard: No
Oil capacity
Fuel tank (L): 410
Hydraulic fuel tank (L): 120
Hydraulic system (L): 260 (including fuel tank)
Equal oil replacement volume (L): 30
Cooling (L): 25
Subject size
Total transportation length (mm): 9460
Total width of transportation (mm): 2800
Total transportation height (mm): 3050
High (MM): 2950
Dignation off ground clearance (mm): 1020
Track ground length (mm): 3265
Total track length (mm): 4075
Track board width (mm): 600
Total width (mm): 2800
Track distance (MM): 2200
Minimum ground clearance (mm): 450
Back -end turning radius (mm): 2750
Scope
The maximum excavation radius (mm): 9850
Maximum excavation depth (mm): 6710
Maximum excavation height (MM): 9840
Maximum uninstallation height (MM): 6500
Maximum vertical mining depth (mm): 6180
Maximum excavation depth (2.5 meters level) (mm): 654
Bullet Board width × height (mm): no bulldozer shovel
Bullet board raising or pushing depth (mm): No bulldozer shovel

Leave A Comment